WP7: Demonstration

This work package comprises the basic design of 5 MWth Demonstrator [task 7.1], detailed design and tendering / procurement / manufacturing [task 7.2], civil Works, Installation and Erection [task 7.3], cold and hot commissioning [task 7.4], Test and demonstration [7.5] and evaluation and documentation [7.6]. This work package is led by: UEvora.

Objectives:

  • Preparation and upgrade works at demonstrator site
  • Shipping, erection and commissioning of OTSG
  • Shipping, erection and commissioning of software and hardware modules for Integrated weather forecasting, machine learning, dispatch optimization, control system
  • Define a test plan based on operating scenarios (coordinated with WP2)
  • Execute test plan
  • Collect and validate data
  • Evaluate, track and control technical risks